Bulk Deployment Upgrade: Excel-Based Onboarding for 1,000+ Unit Projects Now Live

Announcement
Zhejiang Lading Technology Co., Ltd. formally announces a platform upgrade to accelerate large-scale smart living deployments. The enhanced batch onboarding capabilities for LDRENTING and FANDAN PMS are effective immediately upon publication and available to all current and new commercial clients. Explore the full hardware lineup at [FANDAN official site](https://store.fandanlock.com).
Why Large-Scale Delivery Depends on Batch Deployment
For large apartment portfolios, hotels, and short-term rental operations managing 1,000+ units, the traditional device-by-device configuration and room-by-room authorization process often stretches project delivery across several weeks. Redundant data entry, fragmented permission management, and multi-building complexity drive up labor costs and delay revenue generation. Drawing on our Yongkang headquarters' experience delivering over 10 million devices across 28 countries, we have now integrated enterprise-grade batch processing directly into the management console, compressing thousand-unit project go-live timelines from months to days.
What Has Been Upgraded
This release centers on three objectives: one-time data ingestion, bulk permission distribution, and instant device activation. It has been validated across FANDAN's full catalog of 19+ smart lock and access control models.
- **Standardized Excel Template Import**: The admin console now includes a purpose-built import template for property and lock profiles. Operators simply populate building, unit, room number, and device SN, then upload to generate thousands of room records instantly—eliminating manual entry entirely. Download the template and tutorial from the Support Center at [FANDAN official site](https://store.fandanlock.com).
- **Full Model & Multi-Protocol Compatibility**: Batch deployment supports the complete FANDAN range, including F25, F25MINI, P30, P40, F9PRO+, G20PRO, F15, and F19, across all four system versions: TTLOCK, Tuya, BLUELOCK, and LDLOCK. Regardless of communication protocol, bulk authorization and key issuance are managed through a single unified backend.
- **Bulk Authorization with Lifecycle Management**: Within LDRENTING or FANDAN PMS, administrators can apply batch passwords, fingerprint credentials, or card access to entire buildings or floors, with automatic activation and expiration tied to lease terms. Compared with legacy single-device configuration, labor investment drops by over 80% while eliminating missed or incorrect setups.
- **Dramatically Shorter Delivery Cycles**: In a typical 1,000-unit long-term apartment project, legacy methods required two to three engineers working 10 to 15 consecutive days on-site. After the upgrade, backend import and bulk authorization are completed in one to two business days, with on-site work limited to physical installation and online confirmation—reducing overall delivery time by approximately 70%.
What You Need to Do

For clients currently preparing or already contracted on large projects, we recommend completing the following steps before devices arrive on-site:
- Log in to the LDRENTING or FANDAN PMS admin console and download the latest Excel import template from the Project Initialization module.
- Prepare property baseline data (building, floor, room number) and corresponding device SNs in advance, then have your project manager perform the pre-import.
- If your project uses the FANDAN HOME public rental housing custom edition or private deployment, contact your dedicated technical advisor to confirm bulk API integration details.
Projects that do not adopt batch import may continue using the original single-device workflow, but will experience significantly longer delivery timelines and higher labor costs. We strongly recommend that all 1,000+ unit projects prioritize this upgraded capability.
Frequently Asked Questions

**Can I add units after the initial bulk import?**
Yes. You may download the incremental template at any time to import additional rooms and locks. The system will merge new entries into the existing project archive without disrupting currently online devices.
**Will Excel errors corrupt my project data?**
No. The system enforces built-in validation rules for duplicate room numbers, incorrect SN formats, and missing building hierarchies. Errors are flagged in red before writing, ensuring data integrity.
**Does this upgrade apply to previously deployed projects?**
Yes. Existing project data structures are fully compatible with the new batch functions. You can export historical backups and use bulk editing to refresh permissions or correct records for installed devices.
**When do tenants receive their digital keys after bulk authorization?**
Activation timing is set by the administrator during import. Cloud authorization typically reaches the lock within 3–5 seconds, and tenants can retrieve credentials immediately via the LDLOCK app or mini-program.
**Is there an additional charge for bulk deployment?**
No. Bulk deployment is a core platform feature included for all contracted clients at no extra cost.
Contact Us

If you have questions about the batch deployment workflow or need assistance with template preparation and private deployment integration, please reach out through the channels below:
- Customer Hotline: Available during business hours
- Live Chat: Visit [FANDAN official site](https://store.fandanlock.com) and click the chat widget
- Dedicated Advisor: Current clients may contact their assigned project manager or channel representative
Backed by Yongkang manufacturing capacity of 2 million units annually and global delivery expertise across 28 countries, FANDAN provides end-to-end hardware and software solutions for large-scale projects. Whether you are a residential group, hotel investor, or international systems integrator, we invite you to **Get Free Sample** and validate our batch deployment efficiency firsthand: [FANDAN official site](https://store.fandanlock.com).
